Experience Case Study
Parking Structure Construction in Tight Area near Hospital in White Plains, NY
Key Issues
The project faced certain challenges including:
- A postage stamp size lot
- Site is on a one-way street
- Located directly across from the White Plains Hospital’s Dickstein Cancer Center main entrance.
Logistics Criteria
The project design required a precast solution for large canopies over both pedestrian and vehicular entrances.
Design Logistics
Dailey Precast designed a mold which seamlessly integrated with the contemporary facade of the garage. The precast solution conveyed architectural intent, provided structural stability and exceeded the client’s expectations.
Introduction
The City of White Plains, NY had a requirement to construct a nine-story parking garage
The Dailey Precast design team met with City Of White Plains officials, White Plains Hospital Dickstein Cancer Center management, local police, local first responders, and construction team members to clearly understand their respective concerns. Dailey mapped out a traffic control and erection plan and conducted a “dry run” with a truck and trailer to ensure the plan safely met the needs of all parties.
Conclusion
Dailey Precast provides a team oriented, solution driven approach to every project. We envision the final project and work closely with clients. This project was a success because:
- We determined the best way to build it
- We ensured design integrity
- We worked within the budget